Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-1-E CANAL ' (1) ·
'E-2-E Canal ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'Frazier Creek ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'Halifax River ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'ICWW ' (1) ·
'Indian River Relief ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'Kellers Canal ' (1) ·
'Lateral H Canal ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD E-4 Canal ' (1) ·
'Tillman Canal ' (1) ·
'WPB Canal (C-51) ' (1)
'53rd Street ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Crosstown Parkway ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Gateway Blvd. ' (1) ·
'Hypoluxo Rd ' (1) ·
'Linton Blvd. ' (1) ·
'MARINA BLVD. ' (1) ·
'Minton Road CR-509' (1) ·
'SR-5 (US-1) ' (1) ·
'SR-518 ' (1) ·
'SR-60 ' (1) ·
'SR-A1A ' (1) ·
'SR802 (Lake Worth)' (1) ·
'SR806 Atlantic Ave' (1) ·
'US-1 ' (1) ·
'Woolbright Road ' (1)
700007 (1) ·
700008 (1) ·
700183 (1) ·
704075 (1) ·
790147 (1) ·
880087 (1) ·
884083 (1) ·
890002 (1) ·
930032 (1) ·
930073 (1) ·
930301 (1) ·
930307 (1) ·
930446 (1) ·
934296 (1) ·
934363 (1) ·
934944 (1) ·
934986 (1) ·
944018 (1)
'.4mi. East of Congress ' (1) ·
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.5 Mile West of I-95 ' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'300' E of FL Turnpike ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'I 95 Exit 56 ' (1) ·
'Just west of I-95 ' (1) ·
'SR-5 S of Roosevelt BR ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)