Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'JONES CREEK ' (1) ·
'Lateral "A" Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral A Canal ' (1) ·
'LATERAL B CANAL ' (1) ·
'Loxahatchee Slough ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'SIMS CREEK ' (1) ·
'SR-91 (Fl. Tpk.) ' (1)
'12th Street ' (1) ·
'16TH ST ' (1) ·
'1st St SW ' (1) ·
'33rd Street ' (1) ·
'37th Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'4th Street ' (1) ·
'5th Street ' (1) ·
'CENTER STREET ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'CR-612 8th Street ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'EB SR808 Glades Rd' (1) ·
'LAWRENCE ROAD ' (1) ·
'Northlake Blvd. EB' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PIONEER ROAD ' (1) ·
'SANDALFOOT BLVD ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR-714 ' (1) ·
'SR-808 Glades Road' (1)
884066 (1) ·
884069 (1) ·
884072 (1) ·
884073 (1) ·
884074 (1) ·
884075 (1) ·
884100 (1) ·
884101 (1) ·
884102 (1) ·
884103 (1) ·
890159 (1) ·
930015 (1) ·
930246 (1) ·
930325 (1) ·
934146 (1) ·
934147 (1) ·
934168 (1) ·
934221 (1) ·
934347 (1) ·
934403 (1) ·
934914 (1) ·
934924 (1)
'0.2MI WEST OF OF A1A ' (1) ·
'0.3MI E OF SR-7 US-441 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'800 ft West of I 95 ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At 58th Ave ' (1) ·
'At CR-613 ' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'Turnpike at Stuart exit. ' (1)
26200974 (1) ·
26205893 (1) ·
26220525 (1) ·
26220527 (1) ·
26233940 (1) ·
26321988 (1) ·
26350275 (1) ·
26401668 (1) ·
26483934 (1) ·
26562633 (1) ·
26562955 (1) ·
27094100 (1) ·
27354128 (1) ·
27360764 (1) ·
27363390 (1) ·
27370020 (1) ·
27372705 (1) ·
27375405 (1) ·
27391280 (1) ·
27393890 (1) ·
27403120 (1) ·
27405750 (1)
80023162 (1) ·
80055515 (1) ·
80062363 (1) ·
80070561 (1) ·
80071243 (1) ·
80071550 (1) ·
80074659 (1) ·
80103501 (1) ·
80115311 (1) ·
80120806 (1) ·
80121038 (1) ·
80181600 (1) ·
80264781 (1) ·
80264806 (1) ·
80264839 (1) ·
80264867 (1) ·
80264892 (1) ·
80264917 (1) ·
80274550 (1) ·
80274570 (1) ·
80274600 (1) ·
80274650 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)