Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CONGRESS AVE SB ' (1) ·
'DUDA ROAD ' (1) ·
'EB Blue Heron Blvd' (1) ·
'EB Lake Worth Rd. ' (1) ·
'EB PGA Blvd. ' (1) ·
'LANTANA ROAD WB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'Saul Street ' (1) ·
'SR-A1A ' (1) ·
'US-1 NB ' (1) ·
'US-98 SR700 US441 ' (1) ·
'WB Lake Worth Rd. ' (1) ·
'WB PGA Blvd. ' (1) ·
SR-507 SB (1)
700190 (1) ·
790186 (1) ·
796518 (1) ·
930106 (1) ·
930267 (1) ·
930328 (1) ·
930329 (1) ·
930349 (1) ·
930465 (1) ·
930468 (1) ·
934331 (1) ·
934341 (1) ·
934519 (1) ·
940004 (1)
'0.6 MI WEST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'0.8MI E OF I-95 ' (1) ·
'1 Mile East of I-95 ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At Reed Canal Road ' (1) ·
'SR-700 CANAL POINT ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
SR-507 SB-Tillman Canal (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)