Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CLEAR LAKE ' (1) ·
'Halifax Canal ' (1) ·
'HUNGERFORD CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-8 CANAL ' (1) ·
'L.W.D.D. #10 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'LWDD L-2 Canal ' (1) ·
'LWDD LAT 16 CANAL ' (1) ·
'LWDD LAT 8 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'Misner Branch ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'WARNER CREEK ' (1)
'AUDUBON BLVD. ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BELVEDERE RD EB ' (1) ·
'Center Avenue ' (1) ·
'DAVIS ROAD ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'KUDZA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'SAVONA BLVD. ' (1) ·
'SEMINOLE DR ' (1) ·
'TROPICALIA AVE. ' (1) ·
'WEST LAKE DRIVE ' (1)
795521 (1) ·
796000 (1) ·
894052 (1) ·
930026 (1) ·
934205 (1) ·
934220 (1) ·
934254 (1) ·
934277 (1) ·
934312 (1) ·
934319 (1) ·
934420 (1) ·
934421 (1) ·
934516 (1) ·
935502 (1) ·
936264 (1) ·
936550 (1) ·
937201 (1) ·
937707 (1) ·
945256 (1)
'0.1Mi S OF CR812 LANTANA ' (1) ·
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI S of FOREST HILL BV' (1) ·
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1MI W OF SR 809 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'At Intersection w LPGA BL' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.