Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'Creek ' (1) ·
'Drainage Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'L-19 Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'None ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'Pine Street ' (1) ·
'Reed Canal ' (1) ·
'SR-91 (FL TURNPIKE) ' (1)
'21ST ST SW ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CR-708 ' (1) ·
'CR-717 ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'Indian Lake Road ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'Levee Road ' (1) ·
'NB I 95 to Gateway' (1) ·
'Oak Lea Drive ' (1) ·
'Spanish River Blvd' (1) ·
'SR-528 EB ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'US98/441 SR15/700 ' (1) ·
'WB SR808 Glades Rd' (1)
700151 (1) ·
790801 (1) ·
796548 (1) ·
884038 (1) ·
884047 (1) ·
890153 (1) ·
890154 (1) ·
890155 (1) ·
890156 (1) ·
890157 (1) ·
894064 (1) ·
930072 (1) ·
930245 (1) ·
930435 (1) ·
930552 (1) ·
930807 (1) ·
930808 (1) ·
934126 (1) ·
935508 (1) ·
949901 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'11.4Mi N of Palm Beach Co' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'3.9Mi N. of Palm Beach Co' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'4.7Mi N. of Palm Beach Co' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'800 ft West of I 95 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'SR-528 EB over Pine St. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.