Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Blue Cypress Marsh ' (1) ·
'C-52 Canal ' (1) ·
'CANAL L-12 ' (1) ·
'Habitat Connectivity ' (1) ·
'Header Creek Canal ' (1) ·
'Indian River Relief ' (1) ·
'L-78 Borrow Canal ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'Loxahatchee Slough ' (1) ·
'Miami Canal L-25 ' (1) ·
'Padgett Branch Marsh ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'St. John's Marsh ' (1) ·
'St. Johns River ' (1) ·
'St. Johns River Relief ' (1) ·
'Ten Mile Creek ' (1) ·
St Johns River (1)
'6 Ave S to NB I-95' (1) ·
'EB SR 70 ' (1) ·
'PGA Blvd (SR786) ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'SR 70 EB ' (1) ·
'SR-40 WB ' (1) ·
'SR-415 ' (1) ·
'SR-520 EB ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-80 EB ' (1) ·
'SR70 EB Okeechobee' (1) ·
'US-192 EB ' (1) ·
'US-27/SR-80 NB ' (1) ·
US-192 EB (1)
700215 (1) ·
700217 (1) ·
700234 (1) ·
790194 (1) ·
790220 (1) ·
880090 (1) ·
880092 (1) ·
880093 (1) ·
880095 (1) ·
880097 (1) ·
880098 (1) ·
880099 (1) ·
930355 (1) ·
930510 (1) ·
930511 (1) ·
930537 (1) ·
930557 (1) ·
940154 (1) ·
940156 (1) ·
940157 (1)
'1.61mi east of PGA&SR710 ' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'12.1Mi. E of SR-91 (TPK) ' (1) ·
'16Mi W of SR-7 ' (1) ·
'1mi. west of CR-613 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'3.9 MI W of FL Tpk SR 91 ' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1) ·
'7 MI W of FL TPK SR91 ' (1) ·
'At John Stretch Park ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1) ·
'SR-40 WB - Habitat Connec' (1) ·
'SR-415 -St. Johns Relief ' (1) ·
'SR-520 EB-St. Johns River' (1) ·
'US-192 EB - Indian Riv ' (1) ·
US-192 EB-St Johns River (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.