Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'Drainage Canal ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Header Canal ' (1) ·
'Kings Road ' (1) ·
'Konomac Canal ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'None ' (1) ·
'Pine Street ' (1) ·
'ROY'S SWALE ' (1) ·
'SR 70 ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1)
'Fort Florida Road ' (1) ·
'NB I 95 to Gateway' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Old Dixie Highway ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SILVER FOX LANE ' (1) ·
'SR-407 ' (1) ·
'SR-528 EB ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-76 ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'WB SR 70 ' (1)
700090 (1) ·
700151 (1) ·
794123 (1) ·
794124 (1) ·
794162 (1) ·
890121 (1) ·
890126 (1) ·
890141 (1) ·
890142 (1) ·
894042 (1) ·
930435 (1) ·
930447 (1) ·
931002 (1) ·
931003 (1) ·
940119 (1) ·
940126 (1) ·
940127 (1) ·
940135 (1) ·
940143 (1)
'.25mi W OF I-95 ' (1) ·
'.5mi So. of St Lucie Blvd' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1.5mi East of Indiantown' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'SR-528 EB over Pine St. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.