Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'CANAL ' (1) ·
'Canal - D ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'JOANN CANAL ' (1) ·
'LAKE WORTH ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'RELIEF CANAL ' (1) ·
'Samsula Canal ' (1) ·
'Sebastian Inlet ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'St. Johns River ' (1) ·
'Turnbull Creek ' (1) ·
'Yacht Club Cut ' (1) ·
INDIAN RIVER (1)
'4TH STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-611 (43 AVE) ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'Fifth Street ' (1) ·
'Hunting Camp Road ' (1) ·
'ISLAND ROAD ' (1) ·
'Samsula Drive ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-50 EB ' (1) ·
'SR-50 WB ' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SR-A1A ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-1 NB ' (1) ·
'US-98 (SR-80) ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
700013 (1) ·
700028 (1) ·
700077 (1) ·
700107 (1) ·
700110 (1) ·
700115 (1) ·
700143 (1) ·
703001 (1) ·
703002 (1) ·
790086 (1) ·
794184 (1) ·
794185 (1) ·
795701 (1) ·
880005 (1) ·
880020 (1) ·
880045 (1) ·
880063 (1) ·
884019 (1) ·
884022 (1) ·
884027 (1) ·
884038 (1) ·
884039 (1) ·
930004 (1) ·
930402 (1) ·
936802 (1)
'0.1mi E of Riverside Dr ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'0.6MI N OF CR-606 ' (1) ·
'0.7MI W OF SR-401 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'1.1MI N OF SR-60 ' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-50 EB -St Johns River ' (1) ·
'SR-50 WB -St Johns River ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
KENNEDY SPACE CENTER (1)
26405778 (1) ·
26414288 (1) ·
26495569 (1) ·
27355338 (1) ·
27363418 (1) ·
27392653 (1) ·
27421622 (1) ·
27430923 (1) ·
27431010 (1) ·
27445555 (1) ·
27481770 (1) ·
27513635 (1) ·
28122256 (1) ·
28122319 (1) ·
28241003 (1) ·
28241828 (1) ·
28241892 (1) ·
28313826 (1) ·
28313884 (1) ·
28323696 (1) ·
28323763 (1) ·
28491441 (1) ·
28592979 (1) ·
28594816 (1) ·
29004760 (1)
80023337 (1) ·
80033671 (1) ·
80162947 (1) ·
80255007 (1) ·
80265430 (1) ·
80274275 (1) ·
80274430 (1) ·
80284706 (1) ·
80285095 (1) ·
80294169 (1) ·
80294391 (1) ·
80301990 (1) ·
80384625 (1) ·
80384626 (1) ·
80390039 (1) ·
80390071 (1) ·
80440519 (1) ·
80454983 (1) ·
80513571 (1) ·
80545465 (1) ·
80555809 (1) ·
80555859 (1) ·
81022736 (1) ·
81025853 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)