Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'Angle Rd - Belcher Canal' (1) ·
'ANGLE RD & BELCHER CANAL' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'CANAL L-20 ' (1) ·
'CR-515 & Indian River ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'HOWARD CREEK ' (1) ·
'Indian River ' (1) ·
'Lake Washington Road ' (1) ·
'Service Rd & Canal ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1) ·
Lake Washington Road (1)
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'MINUTE MAID RD 165' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB US 1 ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-401 SB ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 157.9 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'US-441 SR-15 ' (1) ·
I-95 SB (1)
700015 (1) ·
700030 (1) ·
700031 (1) ·
700043 (1) ·
700061 (1) ·
700109 (1) ·
700123 (1) ·
700137 (1) ·
790196 (1) ·
790197 (1) ·
880100 (1) ·
890103 (1) ·
930497 (1) ·
930498 (1) ·
931004 (1) ·
940001 (1) ·
940057 (1) ·
940058 (1) ·
940059 (1) ·
940073 (1) ·
940083 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940114 (1)
'.3 m N of Martin Co. line' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'9.38 MI NORTH OF SR-68 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'I-95 NB -Lk Washington Rd' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'US-441 and SR-76 ' (1) ·
I-95 SB -Lk Washington Rd (1)
26280900 (1) ·
26404472 (1) ·
26590720 (1) ·
27160451 (1) ·
27171853 (1) ·
27172347 (1) ·
27281041 (1) ·
27281279 (1) ·
27281300 (1) ·
27281411 (1) ·
27283927 (1) ·
27283929 (1) ·
27290688 (1) ·
27363540 (1) ·
28084581 (1) ·
28084584 (1) ·
28212281 (1) ·
28212408 (1) ·
28240428 (1) ·
28240489 (1) ·
28243313 (1) ·
28243314 (1) ·
28500676 (1) ·
28500808 (1)
80052100 (1) ·
80052215 (1) ·
80095982 (1) ·
80171233 (1) ·
80251481 (1) ·
80251602 (1) ·
80252971 (1) ·
80254109 (1) ·
80263496 (1) ·
80263571 (1) ·
80270210 (1) ·
80270308 (1) ·
80304170 (1) ·
80333288 (1) ·
80370127 (1) ·
80375608 (1) ·
80375690 (1) ·
80422077 (1) ·
80422180 (1) ·
80430520 (1) ·
80430569 (1) ·
80444559 (1) ·
80444580 (1) ·
81190878 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)