Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'C-51 Canal ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I-95 ' (1) ·
'Jupiter Creek ' (1) ·
'South Relief Canal ' (1) ·
'SR-46 ' (1) ·
'Turkey Creek ' (1) ·
Banana River Relief (1) ·
Horse Creek (1)
700188 (1) ·
700192 (1) ·
700203 (1) ·
700206 (1) ·
700230 (1) ·
880089 (1) ·
880100 (1) ·
880101 (1) ·
880105 (1) ·
930265 (1) ·
930414 (1) ·
930415 (1) ·
930420 (1) ·
930460 (1) ·
934297 (1)
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'CR-516 over I-95 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'I-95 over SR-46 ' (1) ·
'SR-80 & Military Trail ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 over Turkey Creek ' (1) ·
SR-520 - Banana River (1) ·
US-1 over Horse Creek (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)