Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700031 (1) ·
794004 (1) ·
794025 (1) ·
880063 (1) ·
884019 (1) ·
884027 (1) ·
884038 (1) ·
884039 (1) ·
930004 (1) ·
930402 (1) ·
935506 (1)
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.5 Mi W of SR-A1A ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-401 SB - Barge Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)