Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Traffic Year 030:
2016
& Scour 113:
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event.
Use the filters below to narrow your results.
704256 (1) ·
705500 (1) ·
705907 (1) ·
705908 (1) ·
705913 (1) ·
705915 (1) ·
794014 (1) ·
794020 (1) ·
794061 (1) ·
794065 (1) ·
794162 (1) ·
884103 (1)
'0.1Mi W of Marsh Road ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.3 mi North of Taylor Rd' (1) ·
'0.5 mi N of Malabar Rd. ' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'0.9 mile North of CR-40A ' (1) ·
'10ft. E of Minton Road ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'At CR-615 (66th Ave) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)