Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Traffic Year 030:
2016
& Scour 113:
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.
Use the filters below to narrow your results.
704063 (1) ·
790012 (1) ·
794009 (1) ·
794010 (1) ·
794019 (1) ·
794036 (1) ·
794045 (1) ·
880005 (1) ·
880077 (1) ·
930339 (1)
'0.1 Mi North of Taylor Rd' (1) ·
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.2 mi E of CR-415 ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'City of Jupiter ' (1) ·
'US-1 over Reed Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)