Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Scour 113 : Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures. or Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event.

Use the filters below to narrow your results.

Status:
Date:
County 003:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service On 042a:
Service Under 042b:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 6 results in range #1 to #6.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)