Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Scour 113 : Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures or Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.

Use the filters below to narrow your results.

ObjectID:
Status:
Direction 005e:
Critical 006b:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Lanes 028a:
2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1)
Traffic Year 030:
Length 049:
Width 052:
0 (1) · 10 (1) · 11 (1) · 12 (1) · 13 (1) · 14 (1) · 15 (1) · 16 (1) · 17 (1) · 18 (1) · 20 (1) · 22 (1) · 26 (1) · 29 (1) · 31 (1) · 6 (1) · 7 (1) · 9 (1)
Superstructure 059:
Direction 102:
Scour 113: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 41 results in range #1 to #41.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)