Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Scour 113 : Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures or Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event.

Use the filters below to narrow your results.

ObjectID:
Status:
Direction 005e:
Critical 006b:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 6 (1) · 7 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
10 (1) · 11 (1) · 12 (1) · 13 (1) · 14 (1) · 15 (1) · 20 (1) · 28 (1) · 3 (1) · 33 (1) · 36 (1) · 37 (1) · 41 (1) · 6 (1) · 7 (1) · 8 (1) · 9 (1)
Substructure 060:
Culvert 062:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 41 results in range #1 to #41.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)