Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Scour 113 : Bridge foundations (including piles) on dry land well above flood water elevations. or Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event.

Use the filters below to narrow your results.

Status:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 6 (1)
Traffic Year 030:
Length 049:
Width 052:
10 (1) · 11 (1) · 12 (1) · 14 (1) · 15 (1) · 16 (1) · 20 (1) · 25 (1) · 3 (1) · 37 (1) · 6 (1) · 7 (1) · 8 (1) · 9 (1)
Substructure 060:
Culvert 062:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 36 results in range #1 to #36.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)