Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Scour 113 :
Bridge foundations (including piles) on dry land well above flood water elevations. or
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures
Use the filters below to narrow your results.
700184 (1) ·
700190 (1) ·
700194 (1) ·
700196 (1) ·
700206 (1) ·
700213 (1) ·
700214 (1) ·
700224 (1) ·
700229 (1) ·
880100 (1) ·
934367 (1) ·
934945 (1) ·
934946 (1)
'1.2 Mi. East of Lyons Rd.' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
I-95 over Addison Canal (1) ·
SR-46 over Six Mile Cr (1) ·
SR-507 SB-Tillman Canal (1) ·
SR-518 over Indian River (1) ·
SR-520 - Indian River Relief (1) ·
US-1 over Horse Creek (1) ·
US-1 over Sebastian River (1) ·
US-192 EB-St Johns Relief (1) ·
US-192 WB- St Johns River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)