Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790033 (1) ·
790034 (1) ·
790035 (1) ·
790124 (1) ·
790198 (1) ·
790219 (1) ·
790220 (1) ·
794007 (1) ·
794008 (1) ·
794019 (1) ·
794045 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.1 Mi North of Taylor Rd' (1) ·
'0.6 mi North of Taylor Rd' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-415 - Deep Creek ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-415 - St Johns Relief ' (1) ·
'SR-415 - St. Johns River ' (1) ·
'SR-415 -St. Johns Relief ' (1) ·
'SR-415- St.Johns River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.