Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C.S.X. R/R ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'E-4 Canal ' (1) ·
'El Rio Canal ' (1) ·
'HOWARD CREEK ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'L-5 CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1)
'Australian Ave. ' (1) ·
'CLINT MOORE RD ' (1) ·
'CLINT MOORE RD WB ' (1) ·
'CLINT MOORE RD. WB' (1) ·
'Hypoluxo Rd ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'LE CHALET BLVD ' (1) ·
'Lyons Rd ' (1) ·
'LYONS ROAD ' (1) ·
'Old Boynton Road ' (1) ·
'Orange camp Rd. ' (1) ·
'Spanish River Blvd' (1) ·
'WESTMORELAND BLVD ' (1) ·
'Woolbright Road ' (1)
790211 (1) ·
930300 (1) ·
930529 (1) ·
934271 (1) ·
934272 (1) ·
934362 (1) ·
934487 (1) ·
934913 (1) ·
934929 (1) ·
934953 (1) ·
934954 (1) ·
934956 (1) ·
934966 (1) ·
934968 (1) ·
934981 (1) ·
935222 (1) ·
935223 (1) ·
945250 (1)
'0.3Mi E of Military Trail' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'AT US-441 SR-7 ' (1) ·
'North of P. Beach Airport' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'W of I 95 on Woolbright ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.