Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'E-4 Canal ' (1) ·
'Eau Gallie River ' (1) ·
'Halifax River ' (1) ·
'HOWARD CREEK ' (1) ·
'I-4 ' (1) ·
'L-5 CANAL ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB CANAL C-51 ' (1)
'Apollo Boulevard ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CLINT MOORE RD WB ' (1) ·
'CLINT MOORE RD. WB' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'KIRK ROAD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'Old Boynton Road ' (1) ·
'Orange Avenue ' (1) ·
'Orange camp Rd. ' (1) ·
'SW 15TH AVE ' (1) ·
'WESTMORELAND BLVD ' (1)
705604 (1) ·
790211 (1) ·
794120 (1) ·
934271 (1) ·
934272 (1) ·
934293 (1) ·
934461 (1) ·
934487 (1) ·
934751 (1) ·
934913 (1) ·
934956 (1) ·
934966 (1) ·
934968 (1) ·
934981 (1) ·
937715 (1) ·
945250 (1)
'0.2 Mi East of Australian' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Orange camp Rd. over I-4 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.