Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'Daytona Canal ' (1) ·
'E-1 Canal ' (1) ·
'Halifax River ' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE WORTH ' (1) ·
'LATERAL A CANAL ' (1) ·
'Lateral B Canal ' (1) ·
'LATERAL CANAL C ' (1) ·
'Platt Ranch Access Road ' (1) ·
'Samsula Canal ' (1) ·
'Yacht Club Cut ' (1)
'13th Street SW ' (1) ·
'4TH STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'Ballough Street ' (1) ·
'Bellevue Avenue ' (1) ·
'Fifth Street ' (1) ·
'Highbridge Road ' (1) ·
'Hunting Camp Road ' (1) ·
'ISLAND DRIVE ' (1) ·
'ISLAND ROAD ' (1) ·
'Main Street ' (1) ·
'Samsula Drive ' (1) ·
'Service Road ' (1) ·
'Spanish River Blvd' (1) ·
'St. Johns Heritage' (1) ·
'Stribling Way ' (1)
704048 (1) ·
704190 (1) ·
790241 (1) ·
794004 (1) ·
794025 (1) ·
794184 (1) ·
794185 (1) ·
795000 (1) ·
795701 (1) ·
884022 (1) ·
884038 (1) ·
884105 (1) ·
930552 (1) ·
934301 (1) ·
935506 (1) ·
936802 (1)
'.3 mi South of Mason Ave ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'0.5 Mi W of SR-A1A ' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'AT 74TH AVE. ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'StriblingWay ovr E-1canal' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.