Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790084 (1) ·
790166 (1) ·
790167 (1) ·
790171 (1) ·
930260 (1) ·
930434 (1) ·
930809 (1) ·
940133 (1) ·
940160 (1) ·
940161 (1)
'1.5 miles North of SR 804' (1) ·
'10th Ave over I 95 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Old Dixie Hwy over I-95 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)