Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'C-133 Canal ' (1) ·
'C-44 Intake Canal ' (1) ·
'E-1 CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'LAKE OSBOURNE ' (1) ·
'Long Creek ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'ORANGE CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Troup Indiantown Canal ' (1)
'CR-726 CITRUS BLVD' (1) ·
'CR726 (Citrus Blv)' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'Lantana Road ' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 812 Lantana Rd ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1)
890015 (1) ·
894029 (1) ·
894053 (1) ·
894057 (1) ·
894058 (1) ·
930276 (1) ·
934341 (1) ·
934342 (1) ·
934360 (1) ·
934365 (1) ·
934366 (1) ·
940139 (1) ·
940140 (1) ·
940142 (1) ·
940144 (1) ·
940145 (1)
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'1.74 Miles E of SR-710 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2mi. East of SR-91 ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'4.85 Miles E of SR-710 ' (1) ·
'5.8Mi. E of SR-710 ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Port St Lucie / FL TPK. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)