Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'Danforth Creek ' (1) ·
'E-2-E Canal ' (1) ·
'E-3 CANAL ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'Kellers Canal ' (1) ·
'LWDD E-1 Canal ' (1) ·
'Okeechobee Waterway ' (1) ·
'POPPELTON CREEK ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-91 (Fl. Tpk.) ' (1)
'CR-713 ' (1) ·
'CR-714 Indian St. ' (1) ·
'CR714 PALM CITY RD' (1) ·
'EB Lake Worth Rd. ' (1) ·
'EB Martin Downs Bd' (1) ·
'EB SR - 714 ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'Kings Highway ' (1) ·
'Lake Worth Road ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-714 ' (1) ·
'SR802 (Lake Worth)' (1) ·
'WB Lake Worth Rd. ' (1) ·
'WB Martin Downs Bd' (1) ·
'WB SR - 714 ' (1) ·
'WB SR 802 Lake Ave' (1)
890038 (1) ·
890039 (1) ·
890134 (1) ·
890135 (1) ·
890143 (1) ·
890159 (1) ·
894009 (1) ·
894062 (1) ·
930073 (1) ·
930104 (1) ·
930318 (1) ·
930328 (1) ·
930329 (1) ·
930413 (1) ·
930456 (1) ·
940007 (1) ·
940143 (1)
'.4mi. East of Congress ' (1) ·
'.5mi So. of St Lucie Blvd' (1) ·
'0.1 MI West of SR-76 ' (1) ·
'0.2MI SOUTH OF CR-714 ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'1/2MI S of US-1 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'SR-714 East of Fla. Tpke.' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)