Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'E-2W Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Long Creek ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 (Florida Turnpike)' (1)
'Atlantic Ave. ' (1) ·
'Atlantic Avenue ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'E/B Atlantic Ave. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'Port St. Lucie Bld' (1) ·
'SR806 Atlantic Ave' (1) ·
'W/B Atlantic Ave ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1) ·
'West Atlantic Ave.' (1)
930032 (1) ·
930064 (1) ·
930069 (1) ·
930240 (1) ·
930437 (1) ·
930440 (1) ·
930463 (1) ·
940035 (1) ·
940050 (1) ·
940139 (1) ·
940140 (1) ·
940142 (1) ·
940144 (1) ·
940145 (1)
'1.8mi. East of SR-91 ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'1MI W of US-1 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'2mi. East of SR-91 ' (1) ·
'300' E of FL Turnpike ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'Port St Lucie / FL TPK. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)