Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'Canal L-14 ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'FEC Railroad ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-6 Canal ' (1) ·
'LWDD L-2 CANAL ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'M CANAL ' (1) ·
'MOORES CREEK ' (1) ·
'St. Lucie River ' (1) ·
'WARNER CREEK ' (1) ·
'WB SR 80 ' (1)
890003 (1) ·
890113 (1) ·
930056 (1) ·
930163 (1) ·
930466 (1) ·
930475 (1) ·
930476 (1) ·
930532 (1) ·
930533 (1) ·
934251 (1) ·
934258 (1) ·
934331 (1) ·
934332 (1) ·
934470 (1) ·
934491 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
940020 (1) ·
940047 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'SE quadrant PB Int Airpt ' (1)
26252844 (1) ·
26280864 (1) ·
26280868 (1) ·
26290167 (1) ·
26290169 (1) ·
26322160 (1) ·
26344631 (1) ·
26344632 (1) ·
26360932 (1) ·
26394300 (1) ·
26403485 (1) ·
26403530 (1) ·
26403721 (1) ·
26403812 (1) ·
26415533 (1) ·
26445836 (1) ·
26570930 (1) ·
27121243 (1) ·
27132086 (1) ·
27263922 (1) ·
27270481 (1)
80044370 (1) ·
80045427 (1) ·
80045433 (1) ·
80045945 (1) ·
80045990 (1) ·
80051244 (1) ·
80051800 (1) ·
80052073 (1) ·
80052230 (1) ·
80052259 (1) ·
80052317 (1) ·
80052320 (1) ·
80052387 (1) ·
80052654 (1) ·
80053227 (1) ·
80053541 (1) ·
80053609 (1) ·
80135221 (1) ·
80154065 (1) ·
80192498 (1) ·
80192646 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)