Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 CANAL ' (1) ·
'E-1 Canal ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FEC Railroad ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Loxahatchee Slough ' (1) ·
'Military Trail & CSX RR ' (1) ·
'MOORES CREEK ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'St. Lucie River ' (1) ·
'WARNER CREEK ' (1)
'CR-707 (BEACH RD) ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'DIXIE HIGHWAY ' (1) ·
'EB PGA Blvd. ' (1) ·
'EB SR 786 ' (1) ·
'EB SR808 Glades Rd' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'PGA Blvd (SR786) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-808 Glades Road' (1) ·
'SR786 WB to SB I95' (1) ·
'WB PGA Blvd. ' (1) ·
'WB SR 786 ' (1) ·
'WB SR808 Glades Rd' (1)
890003 (1) ·
890113 (1) ·
930056 (1) ·
930106 (1) ·
930245 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
930265 (1) ·
930319 (1) ·
930325 (1) ·
930349 (1) ·
930356 (1) ·
930388 (1) ·
930401 (1) ·
930414 (1) ·
930415 (1) ·
930491 (1) ·
930492 (1) ·
930557 (1) ·
940020 (1) ·
940047 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1st overpass east of I-95' (1) ·
'800 ft West of I 95 ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'Tpk/PGA Blvd interchange ' (1)
26214420 (1) ·
26220386 (1) ·
26220391 (1) ·
26220396 (1) ·
26220525 (1) ·
26220527 (1) ·
26220535 (1) ·
26220610 (1) ·
26220625 (1) ·
26502106 (1) ·
26502431 (1) ·
26502490 (1) ·
26502600 (1) ·
26503600 (1) ·
26503900 (1) ·
26504000 (1) ·
26504098 (1) ·
26570930 (1) ·
27121243 (1) ·
27132086 (1) ·
27263922 (1) ·
27270481 (1)
80035722 (1) ·
80040100 (1) ·
80044370 (1) ·
80054200 (1) ·
80054600 (1) ·
80054930 (1) ·
80060970 (1) ·
80070620 (1) ·
80070650 (1) ·
80071550 (1) ·
80071555 (1) ·
80074659 (1) ·
80074689 (1) ·
80095948 (1) ·
80101354 (1) ·
80101677 (1) ·
80102860 (1) ·
80121129 (1) ·
80135221 (1) ·
80154065 (1) ·
80192498 (1) ·
80192646 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)