Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'FEC Railroad ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-30 CANAL ' (1) ·
'Long Creek ' (1) ·
'Loxahatchee Slough ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'MOORES CREEK ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'Northlake Blvd. WB ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'St. Lucie River ' (1) ·
'Thompson River ' (1) ·
'WARNER CREEK ' (1)
'CR-707 (BEACH RD) ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'DIXIE HIGHWAY ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'Loxahatchee Slough' (1) ·
'Military Trail ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'Northlake Blvd. EB' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1)
890003 (1) ·
890113 (1) ·
930056 (1) ·
930267 (1) ·
930268 (1) ·
930460 (1) ·
934138 (1) ·
934148 (1) ·
934149 (1) ·
934167 (1) ·
934168 (1) ·
934318 (1) ·
934915 (1) ·
934916 (1) ·
934936 (1) ·
934937 (1) ·
940020 (1) ·
940047 (1) ·
940139 (1) ·
940140 (1) ·
940142 (1) ·
940144 (1) ·
940145 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'2mi. East of SR-91 ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-80 & Military Trail ' (1)
26252770 (1) ·
26252771 (1) ·
26290244 (1) ·
26290245 (1) ·
26361307 (1) ·
26403700 (1) ·
26482992 (1) ·
26483050 (1) ·
26483417 (1) ·
26483495 (1) ·
26483934 (1) ·
26483998 (1) ·
26494457 (1) ·
26570930 (1) ·
27121243 (1) ·
27132086 (1) ·
27161795 (1) ·
27161803 (1) ·
27161886 (1) ·
27161895 (1) ·
27162224 (1) ·
27263922 (1) ·
27270481 (1)
80044370 (1) ·
80050893 (1) ·
80050894 (1) ·
80061936 (1) ·
80064300 (1) ·
80065069 (1) ·
80071862 (1) ·
80071933 (1) ·
80072101 (1) ·
80072169 (1) ·
80075215 (1) ·
80075217 (1) ·
80103494 (1) ·
80103501 (1) ·
80135221 (1) ·
80154065 (1) ·
80191739 (1) ·
80192218 (1) ·
80192498 (1) ·
80192646 (1) ·
80192691 (1) ·
80193090 (1) ·
80213032 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)