Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 CANAL ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Long Creek ' (1) ·
'Loxahatchee Slough ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'South Relief Canal ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'TAYLOR CREEK ' (1)
'CR605 Old Dixie ' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'EB PGA Blvd. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB SR 786 ' (1) ·
'EB St. Lucie Blvd.' (1) ·
'PGA Blvd (SR786) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'Port St. Lucie Bld' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR786 WB to SB I95' (1) ·
'WB PGA Blvd. ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB SR 786 ' (1) ·
'WB St. Lucie Blvd.' (1)
884086 (1) ·
930106 (1) ·
930265 (1) ·
930349 (1) ·
930356 (1) ·
930388 (1) ·
930491 (1) ·
930492 (1) ·
930557 (1) ·
940029 (1) ·
940139 (1) ·
940140 (1) ·
940142 (1) ·
940144 (1) ·
940145 (1)
'0.3 MILES NORTH OF US-1 ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1st overpass east of I-95' (1) ·
'2mi. East of SR-91 ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)