Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'BELCHER CANAL C-25 ' (1) ·
'C-18 CANAL ' (1) ·
'FEC Railroad ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Loxahatchee Slough ' (1) ·
'MOORES CREEK ' (1) ·
'NORTH CANAL ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'St. Lucie River ' (1) ·
'WARNER CREEK ' (1)
'CR-603-IND RIV BLV' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'CR603(JOHNSTON RD)' (1) ·
'DIXIE HIGHWAY ' (1) ·
'EB PGA Blvd. ' (1) ·
'EB SR 786 ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'PGA Blvd (SR786) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR786 WB to SB I95' (1) ·
'WB PGA Blvd. ' (1) ·
'WB SR 786 ' (1)
884054 (1) ·
884058 (1) ·
884060 (1) ·
890003 (1) ·
890113 (1) ·
930056 (1) ·
930106 (1) ·
930265 (1) ·
930349 (1) ·
930356 (1) ·
930388 (1) ·
930491 (1) ·
930492 (1) ·
930557 (1) ·
940020 (1) ·
940047 (1) ·
940071 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'1st overpass east of I-95' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)