Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'A DRAINAGE CANAL ' (1) ·
'C-17 Canal ' (1) ·
'C-18 Canal ' (1) ·
'Danforth Creek ' (1) ·
'DRAINAGE CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'Loxahatchee Slough ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'Okeechobee Waterway ' (1) ·
'POPPELTON CREEK ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'St. Lucie Canal/SR-76 ' (1)
'CR-714 Indian St. ' (1) ·
'CR714 PALM CITY RD' (1) ·
'EB Martin Downs Bd' (1) ·
'EB SR - 714 ' (1) ·
'EB SR-710 ' (1) ·
'Southern Boulevard' (1) ·
'SR 710 ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR-710 ' (1) ·
'SR-710 Beeline Hwy' (1) ·
'SR-710 EB ' (1) ·
'SR-710 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80 ' (1) ·
'US-98 US-441 SR-80' (1) ·
'WB Martin Downs Bd' (1) ·
'WB SR - 714 ' (1) ·
'WB SR-710 ' (1)
890038 (1) ·
890039 (1) ·
890090 (1) ·
890106 (1) ·
890134 (1) ·
890135 (1) ·
890143 (1) ·
890159 (1) ·
890161 (1) ·
890162 (1) ·
894062 (1) ·
930029 (1) ·
930097 (1) ·
930120 (1) ·
930121 (1) ·
930344 (1) ·
930362 (1) ·
930406 (1) ·
930459 (1) ·
930534 (1) ·
930535 (1) ·
930536 (1)
'.2mi East of US-27 ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'.5mi W. of N. Lake Blvd. ' (1) ·
'0.1 MI West of SR-76 ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.5mi East of SR-786 ' (1) ·
'1/2MI S of US-1 ' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'5.8 Miles West of SR-76 ' (1) ·
'8.9 miles west of SR-76 ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'SR-714 East of Fla. Tpke.' (1) ·
'SR-80 3MI E. 20 MI BEND ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'Turnpike at Stuart exit. ' (1)
26395130 (1) ·
26403161 (1) ·
26404100 (1) ·
26410105 (1) ·
26461200 (1) ·
26484490 (1) ·
26492016 (1) ·
26492039 (1) ·
26500886 (1) ·
26521995 (1) ·
26522014 (1) ·
27004322 (1) ·
27004488 (1) ·
27034414 (1) ·
27052013 (1) ·
27093370 (1) ·
27094100 (1) ·
27101997 (1) ·
27102072 (1) ·
27102221 (1) ·
27103152 (1) ·
27112188 (1)
80025423 (1) ·
80053100 (1) ·
80064300 (1) ·
80092239 (1) ·
80101483 (1) ·
80101580 (1) ·
80112928 (1) ·
80144324 (1) ·
80144509 (1) ·
80151390 (1) ·
80152526 (1) ·
80153061 (1) ·
80154828 (1) ·
80161373 (1) ·
80161483 (1) ·
80181600 (1) ·
80184445 (1) ·
80271724 (1) ·
80271798 (1) ·
80315267 (1) ·
80341739 (1) ·
80424470 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)