Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Drainage Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'Long Creek ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'POPPOLTON CREEK ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'SR-91 Turnpike ' (1)
'E/B S.R. 704 ' (1) ·
'EB Okee. Blvd. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB SR 704 ' (1) ·
'EB St. Lucie Blvd.' (1) ·
'Port St. Lucie Bld' (1) ·
'SR-76 ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'W/B S.R. 704 ' (1) ·
'WB Okee. Blvd. ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1)
890048 (1) ·
890126 (1) ·
890127 (1) ·
890141 (1) ·
890142 (1) ·
930183 (1) ·
930210 (1) ·
930417 (1) ·
930418 (1) ·
930506 (1) ·
930507 (1) ·
940139 (1) ·
940140 (1) ·
940142 (1) ·
940144 (1) ·
940145 (1)
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'1.5mi East of Indiantown' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'By Indian Grove Dr. ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-704 Over SR-91 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)