Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
880030 (1) ·
880087 (1) ·
880091 (1) ·
880094 (1) ·
880096 (1) ·
884057 (1) ·
884059 (1) ·
890161 (1) ·
890162 (1) ·
930120 (1) ·
930362 (1) ·
930535 (1) ·
930536 (1)
'0.6Mi. W of SR-A1A ' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)