Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Blue Cypress Marsh ' (1) ·
'C-52 Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'ICWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-78 Borrow Canal ' (1) ·
'MAIN CANAL ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'Padgett Branch Marsh ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SR-91 Turnpike ' (1) ·
'St. John's Marsh ' (1) ·
'St. Johns Marsh ' (1)
880030 (1) ·
880087 (1) ·
880090 (1) ·
880091 (1) ·
880092 (1) ·
880093 (1) ·
880094 (1) ·
880095 (1) ·
880096 (1) ·
880097 (1) ·
880098 (1) ·
880099 (1) ·
884057 (1) ·
884059 (1) ·
930072 (1) ·
930183 (1) ·
930210 (1) ·
930417 (1) ·
930418 (1) ·
930506 (1) ·
930507 (1) ·
934505 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'12.1Mi. E of SR-91 (TPK) ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR-704 Over SR-91 ' (1) ·
'SR60 1.6Miles W. of A1A ' (1)
26420225 (1) ·
26421986 (1) ·
26422136 (1) ·
26422200 (1) ·
26422223 (1) ·
26422701 (1) ·
26422817 (1) ·
27381900 (1) ·
27382573 (1) ·
27382633 (1) ·
27382800 (1) ·
27382850 (1) ·
27382860 (1) ·
27382910 (1) ·
27382980 (1) ·
27383040 (1) ·
27385855 (1) ·
27385856 (1) ·
27390707 (1) ·
27395790 (1) ·
27395850 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)