Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
None (1) ·
54175 (1) ·
58725 (1) ·
Cocoa (1) ·
Daytona Beach (1) ·
DeBary (1) ·
Fort Pierce (1) ·
Melbourne (1) ·
Micco (1) ·
New Smyrna Beach (1) ·
Ormond Beach (1) ·
Palm Bay (1) ·
Palm Beach Gardens (1) ·
Port Orange (1) ·
Port St. John (1) ·
Rockledge (1) ·
Valkaria (1) ·
Vero Beach (1) ·
West Palm Beach (1)
'11th Street Canal ' (1) ·
'B-19 Canal ' (1) ·
'B19 Canal ' (1) ·
'Bessey Creek ' (1) ·
'C-59 Canal ' (1) ·
'Canal ' (1) ·
'Canal to Bulow Creek ' (1) ·
'DANFORTH CREEK ' (1) ·
'Eau Gallie River ' (1) ·
'ELKCAM CANAL ' (1) ·
'EPB - 10 Canal ' (1) ·
'FPL Cooling Disch. Canal' (1) ·
'FPL Cooling Intake Canal' (1) ·
'Gabordy's Canal ' (1) ·
'Goat Creek ' (1) ·
'Golf Cart Underpass ' (1) ·
'Groover Creek ' (1) ·
'Halifax Canal ' (1) ·
'Horse Creek ' (1) ·
'Indian River ' (1) ·
'LATERAL CANAL A ' (1) ·
'MONTERREY WATERWAY ' (1) ·
'Moore's Creek ' (1) ·
'Moores Creek ' (1) ·
'Nova Canal ' (1) ·
'Pluckebaum Canal ' (1) ·
'Range Line Canal ' (1) ·
'Rockledge Creek ' (1) ·
'Sebastian Canal ' (1) ·
'SWA Retention Canal ' (1) ·
'Trib to Groover Creek ' (1) ·
'Turnbull Creek ' (1) ·
'Underhill Slough ' (1) ·
'WPB WATER SUPPLY CANAL ' (1)
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Traffic 029:
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. (1) ·
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Future 114:
Showing below up to 47 results in range #1 to #47.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch