Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C. Stanley Weaver Canal ' (1) ·
'CANAL E-4 ' (1) ·
'CSX Railroad ' (1) ·
'E-3 CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-38 CANAL ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'WARNER CREEK ' (1)
'20TH AVENUE ' (1) ·
'Bellevue Avenue ' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'DIXIE HIGHWAY ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'Dunn Avenue ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'JOG ROAD SB ' (1) ·
'MILITARY TR. NB ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'St. Johns Heritage' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'SW 23RD AVE. ' (1)
704190 (1) ·
790241 (1) ·
794189 (1) ·
884062 (1) ·
890113 (1) ·
930302 (1) ·
930303 (1) ·
930304 (1) ·
934160 (1) ·
934161 (1) ·
934224 (1) ·
934918 (1) ·
934935 (1) ·
934948 (1) ·
934967 (1) ·
934969 (1) ·
935308 (1) ·
949902 (1)
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'Bellevue Avenue over I-95' (1) ·
'Just West of I 95 ' (1) ·
'Over I 95 1 mi S of SR804' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)