Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Rebuilt 106:
2010
& Scour 113 :
Bridge foundations (including piles) on dry land well above flood water elevations. or
Other
Use the filters below to narrow your results.
700034 (1) ·
700117 (1) ·
700119 (1) ·
700126 (1) ·
700127 (1) ·
700176 (1) ·
790082 (1) ·
790093 (1) ·
930004 (1) ·
930026 (1) ·
934914 (1)
'0.3MI E OF US-1 ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'2.3 MI E of US-17 ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'I-95 SB over US-1 ' (1) ·
'I-95 SB- Tillman Canal ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-519 NB I-95 ' (1) ·
'SR-519 SB I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
N/A (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)