Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700075 (1) ·
700087 (1) ·
700141 (1) ·
700151 (1) ·
700951 (1) ·
790035 (1) ·
790049 (1) ·
884023 (1) ·
930001 (1) ·
930265 (1) ·
930325 (1) ·
934213 (1) ·
936801 (1) ·
945000 (1)
'0.1MI WEST OF A1A ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'1.15 Mi S of SR-520 ' (1) ·
'1.2 Mi. W of Barberville ' (1) ·
'AT 4TH STREET ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 SB - SR-404 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)