Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700007 (1) ·
700008 (1) ·
880059 (1) ·
880060 (1) ·
880066 (1) ·
880067 (1) ·
880068 (1) ·
930159 (1) ·
930187 (1) ·
930188 (1) ·
930198 (1) ·
930199 (1) ·
930223 (1) ·
930333 (1) ·
940076 (1)
'0.37MI N OF SR-712 ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.2 MI NO OF LANTANA RD ' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'13 MI S OF SR 60 ' (1) ·
'13 MI SOUTH OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'AT BOCA RATON INTERCHANGE' (1) ·
'Boca Raton ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)