Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'Canal ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'Sawgrass Creek ' (1) ·
'SR-520 ' (1) ·
'St Johns River Relief ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'Tomoka River ' (1) ·
'Triple box culvert ' (1) ·
'US-92 ' (1) ·
'W. Relief Indian River ' (1)
'CLINT MOORE RD ' (1) ·
'CR 880 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'Lake Worth Road ' (1) ·
'PIONEER ROAD ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-5A ' (1) ·
'US-192 EB ' (1) ·
'US-192 WB ' (1)
700018 (1) ·
700023 (1) ·
700052 (1) ·
790042 (1) ·
790071 (1) ·
790072 (1) ·
790077 (1) ·
790078 (1) ·
790100 (1) ·
790136 (1) ·
890066 (1) ·
890138 (1) ·
930015 (1) ·
930038 (1) ·
930178 (1) ·
930273 (1) ·
930413 (1) ·
934221 (1) ·
934929 (1) ·
940009 (1)
'0.5 mi. N of N Lakes Blvd' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'400ft N of SCLRR on SR-5A' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'AT US-441 SR-7 ' (1) ·
'CR 880 AT SIX MILE BEND ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'I-95 SB over US-92 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'US-192EB - Sawgrass Creek' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)