Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'COLLIER CREEK ' (1) ·
'COLLIER WATERWAY ' (1) ·
'Deep Creek ' (1) ·
'El Rio Canal E-4 ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Little Haw Creek ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-520 ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'Tillman Canal ' (1) ·
'US-1 ' (1)
'BARBER STREET ' (1) ·
'ENGLAR DRIVE ' (1) ·
'FLEMING STREET ' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'LAWRENCE ROAD ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-401 NB ' (1) ·
'SR-415 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR519NB(Fiske Blv)' (1) ·
'SR519SB(Fiske Blv)' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'US-1 (SR-5) ' (1) ·
'US-92 ' (1)
700034 (1) ·
700117 (1) ·
700119 (1) ·
700126 (1) ·
700127 (1) ·
700176 (1) ·
790033 (1) ·
790034 (1) ·
790082 (1) ·
790093 (1) ·
885603 (1) ·
885604 (1) ·
885605 (1) ·
930004 (1) ·
930026 (1) ·
930319 (1) ·
934914 (1) ·
935100 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'2.3 MI E of US-17 ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'I-95 SB over US-1 ' (1) ·
'I-95 SB- Tillman Canal ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-415 - Deep Creek ' (1) ·
'SR-519 NB I-95 ' (1) ·
'SR-519 SB I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)