Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'C-18 Canal ' (1) ·
'Canal L-14 ' (1) ·
'Donald Ross Road ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Kings Road ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'Military Trail ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR-528 ' (1) ·
'Tomoka River ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'Congress Ave. ' (1) ·
'CR-717 ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'MARGINAL RD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'Old Dixie Hwy. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SR-3 ' (1) ·
'SR-40 WB ' (1) ·
'SR-401 SB ' (1) ·
'SR-407 ' (1) ·
'SR-407 NB ' (1) ·
'SR91 N/S TPK 93.3 ' (1)
700030 (1) ·
700072 (1) ·
700085 (1) ·
700090 (1) ·
700091 (1) ·
790022 (1) ·
790027 (1) ·
790107 (1) ·
794016 (1) ·
884063 (1) ·
884064 (1) ·
930072 (1) ·
930163 (1) ·
930335 (1) ·
930336 (1) ·
930378 (1) ·
930382 (1) ·
930383 (1) ·
930386 (1) ·
930387 (1) ·
931001 (1) ·
934214 (1) ·
937003 (1)
'0.10 MI S of BURNS ROAD ' (1) ·
'0.25 mile North of SR 786' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'South of Ramp to SR 706 ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-407 NB at SR-528 WB ' (1)
26360932 (1) ·
26370275 (1) ·
26401000 (1) ·
26421986 (1) ·
26494723 (1) ·
26502240 (1) ·
26502290 (1) ·
26504000 (1) ·
26525862 (1) ·
26525996 (1) ·
26554700 (1) ·
26554800 (1) ·
27464527 (1) ·
27473810 (1) ·
28242777 (1) ·
28243313 (1) ·
28270757 (1) ·
28291220 (1) ·
28300578 (1) ·
29091900 (1) ·
29091985 (1) ·
29151780 (1) ·
29203187 (1)
80043826 (1) ·
80052230 (1) ·
80060655 (1) ·
80060720 (1) ·
80061820 (1) ·
80074066 (1) ·
80074402 (1) ·
80085515 (1) ·
80085650 (1) ·
80102528 (1) ·
80104062 (1) ·
80365044 (1) ·
80365186 (1) ·
80375608 (1) ·
80422154 (1) ·
80424695 (1) ·
80501889 (1) ·
80505570 (1) ·
80522877 (1) ·
81043203 (1) ·
81043246 (1) ·
81051074 (1) ·
81072482 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
10236 (1) ·
11798 (1) ·
123619 (1) ·
126 (1) ·
136198 (1) ·
1388 (1) ·
148776 (1) ·
1696 (1) ·
1800 (1) ·
2186 (1) ·
25158 (1) ·
26459 (1) ·
278468 (1) ·
28194 (1) ·
36435 (1) ·
5899 (1) ·
91351 (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)