Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'17th Avenue North ' (1) ·
'Barge Canal ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Kings Road ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-528 ' (1) ·
'Summit Boulevard ' (1) ·
'Tomoka River ' (1) ·
'Triple box culvert ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'CR-717 ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'LA MANCHA AVE. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-3 ' (1) ·
'SR-40 WB ' (1) ·
'SR-407 ' (1) ·
'SR-407 NB ' (1)
700072 (1) ·
700085 (1) ·
700090 (1) ·
700091 (1) ·
790022 (1) ·
790027 (1) ·
790107 (1) ·
884063 (1) ·
884064 (1) ·
930072 (1) ·
930171 (1) ·
930259 (1) ·
930291 (1) ·
930292 (1) ·
930294 (1) ·
937003 (1) ·
937356 (1) ·
940113 (1) ·
940114 (1)
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4 mile North of 45th St' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'I-95 / SR 882 ' (1) ·
'Lake Worth ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-407 NB at SR-528 WB ' (1)
101 (1) ·
115000 (1) ·
1260 (1) ·
14500 (1) ·
15250 (1) ·
21000 (1) ·
213000 (1) ·
226000 (1) ·
236000 (1) ·
3400 (1) ·
38750 (1) ·
600 (1) ·
6800 (1) ·
800 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
11798 (1) ·
126 (1) ·
1388 (1) ·
199525 (1) ·
2186 (1) ·
25158 (1) ·
26459 (1) ·
36435 (1) ·
369555 (1) ·
392110 (1) ·
409460 (1) ·
5899 (1) ·
67231 (1) ·
720 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)