Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'Aurantia Rd. ' (1) ·
'C-18 Canal ' (1) ·
'Canal L-14 ' (1) ·
'COLLIER CREEK ' (1) ·
'COLLIER WATERWAY ' (1) ·
'Deep Creek ' (1) ·
'Donald Ross Road ' (1) ·
'El Rio Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'Military Trail ' (1) ·
'Milner's Canal ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'Service Rd & Canal ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR-44 ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'Tomoka River ' (1)
'BARBER STREET ' (1) ·
'Congress Ave. ' (1) ·
'ENGLAR DRIVE ' (1) ·
'FLEMING STREET ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'MARGINAL RD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'Old Dixie Hwy. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-401 SB ' (1) ·
'SR-415 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'ST LUCIE W BLVD WB' (1)
700030 (1) ·
700046 (1) ·
700138 (1) ·
790033 (1) ·
790034 (1) ·
790065 (1) ·
794016 (1) ·
885603 (1) ·
885604 (1) ·
885605 (1) ·
930069 (1) ·
930163 (1) ·
930251 (1) ·
930319 (1) ·
930335 (1) ·
930336 (1) ·
930378 (1) ·
930382 (1) ·
930383 (1) ·
930386 (1) ·
930387 (1) ·
931001 (1) ·
934214 (1) ·
935100 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.25 mile North of SR 786' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.2 Mi N L.Washington Rd.' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'4.5 Mi. N of SR-46 ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 NB - SR-44 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'South of Ramp to SR 706 ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-415 - Deep Creek ' (1)
26214420 (1) ·
26232830 (1) ·
26273366 (1) ·
26360932 (1) ·
26370275 (1) ·
26401000 (1) ·
26405710 (1) ·
26502240 (1) ·
26502290 (1) ·
26504000 (1) ·
26525862 (1) ·
26525996 (1) ·
26554700 (1) ·
26554800 (1) ·
27190428 (1) ·
27464133 (1) ·
27474990 (1) ·
27475995 (1) ·
28094698 (1) ·
28243313 (1) ·
28434007 (1) ·
28535974 (1) ·
28555594 (1) ·
29004609 (1) ·
29203187 (1)
80052230 (1) ·
80054734 (1) ·
80054930 (1) ·
80055235 (1) ·
80060655 (1) ·
80060720 (1) ·
80061820 (1) ·
80074066 (1) ·
80074402 (1) ·
80085515 (1) ·
80085650 (1) ·
80102528 (1) ·
80104062 (1) ·
80222755 (1) ·
80284214 (1) ·
80291127 (1) ·
80293742 (1) ·
80375608 (1) ·
80393620 (1) ·
80422115 (1) ·
80531567 (1) ·
80591524 (1) ·
81051074 (1) ·
81063625 (1) ·
81080270 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
10000 (1) ·
10236 (1) ·
123619 (1) ·
136198 (1) ·
143138 (1) ·
148776 (1) ·
16830 (1) ·
1696 (1) ·
1800 (1) ·
2603 (1) ·
278468 (1) ·
28194 (1) ·
28350 (1) ·
300155 (1) ·
3036 (1) ·
35268 (1) ·
3556 (1) ·
5378 (1) ·
67665 (1) ·
70268 (1) ·
91351 (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)