Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'North Lake ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'Spruce Creek ' (1) ·
'SR-520 ' (1) ·
'St Johns River Relief ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'W. Relief Indian River ' (1)
'CLINT MOORE RD ' (1) ·
'EB North Lake Blvd' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 SB ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'PALMETTO PK RD ' (1) ·
'PIONEER ROAD ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'Taylor Road ' (1) ·
'US-192 WB ' (1) ·
'WB N. Lake Blvd. ' (1)
700023 (1) ·
700052 (1) ·
790042 (1) ·
790100 (1) ·
794009 (1) ·
880058 (1) ·
890066 (1) ·
890138 (1) ·
930050 (1) ·
930195 (1) ·
930273 (1) ·
934221 (1) ·
934902 (1) ·
934929 (1) ·
940009 (1)
'0.2 mi E of CR-415 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT US-441 SR-7 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)