Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'Barge Canal ' (1) ·
'C-18 Canal ' (1) ·
'COLLIER CREEK ' (1) ·
'COLLIER WATERWAY ' (1) ·
'Deep Creek ' (1) ·
'Drainage Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Kings Road ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-528 ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'TEN MILE CREEK ' (1) ·
'Tomoka River ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'BARBER STREET ' (1) ·
'CR-717 ' (1) ·
'ENGLAR DRIVE ' (1) ·
'FLEMING STREET ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-3 ' (1) ·
'SR-40 WB ' (1) ·
'SR-407 ' (1) ·
'SR-407 NB ' (1) ·
'SR-415 ' (1) ·
'SR-710 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'ST LUCIE W BLVD WB' (1)
700072 (1) ·
700085 (1) ·
700090 (1) ·
700091 (1) ·
790022 (1) ·
790027 (1) ·
790033 (1) ·
790034 (1) ·
790107 (1) ·
884063 (1) ·
884064 (1) ·
885603 (1) ·
885604 (1) ·
885605 (1) ·
930072 (1) ·
930121 (1) ·
930319 (1) ·
930344 (1) ·
935100 (1) ·
937003 (1) ·
940072 (1) ·
949901 (1)
'.5mi W. of N. Lake Blvd. ' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.5mi East of SR-786 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-415 - Deep Creek ' (1)
26214420 (1) ·
26405710 (1) ·
26421986 (1) ·
26484490 (1) ·
26494723 (1) ·
26500886 (1) ·
27190428 (1) ·
27240944 (1) ·
27464133 (1) ·
27464527 (1) ·
27473810 (1) ·
27474990 (1) ·
27475995 (1) ·
28242777 (1) ·
28270757 (1) ·
28291220 (1) ·
28300578 (1) ·
28535974 (1) ·
28555594 (1) ·
29091900 (1) ·
29091985 (1) ·
29151780 (1)
80043826 (1) ·
80054930 (1) ·
80092239 (1) ·
80112928 (1) ·
80222755 (1) ·
80235220 (1) ·
80284214 (1) ·
80291127 (1) ·
80293742 (1) ·
80365044 (1) ·
80365186 (1) ·
80393620 (1) ·
80422154 (1) ·
80424695 (1) ·
80501889 (1) ·
80505570 (1) ·
80522877 (1) ·
81043203 (1) ·
81043246 (1) ·
81063625 (1) ·
81072482 (1) ·
81080270 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)