Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Canal C16 ' (1) ·
'C-51 CANAL ' (1) ·
'Canal ' (1) ·
'CR-5A ' (1) ·
'Creek ' (1) ·
'E-3 Canal ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Lake Worth Tide Relief' (1) ·
'Lake Ashby Canal ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'LATERAL CANAL D ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Miller Creek ' (1) ·
'MOORES CREEK ' (1) ·
'Pine Street ' (1) ·
'Rockledge Canal ' (1) ·
'SR-404 ' (1) ·
'Tillman Canal ' (1) ·
'Trib to Spruce Creek ' (1) ·
'US-1 & FECRR ' (1)
'74TH AVE. ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'IBIS WAY ' (1) ·
'Minton Road CR-509' (1) ·
'NORTH 2ND STREET ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SR-40 ' (1) ·
'SR-415 ' (1) ·
'SR-520 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-808 Glades Road' (1) ·
'SR80(SouthernBlvd)' (1) ·
'Tomoka Farms Rd ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US1(SR5) ' (1) ·
'W. CAMINO REAL ' (1)
700014 (1) ·
700075 (1) ·
700087 (1) ·
700102 (1) ·
700141 (1) ·
700151 (1) ·
700156 (1) ·
700169 (1) ·
700951 (1) ·
704075 (1) ·
790035 (1) ·
790049 (1) ·
794008 (1) ·
794045 (1) ·
884023 (1) ·
930001 (1) ·
930098 (1) ·
930265 (1) ·
930325 (1) ·
934213 (1) ·
934406 (1) ·
936801 (1) ·
945000 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.25mi W of S.R.-A1A ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.15 Mi S of SR-520 ' (1) ·
'1.2 Mi. W of Barberville ' (1) ·
'1.5 Mi East of I-95 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'AT 4TH STREET ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB - US-1 & FECRR ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 SB - SR-404 ' (1) ·
I-95 NB and CR-5A (1)
26203879 (1) ·
26220527 (1) ·
26322094 (1) ·
26382089 (1) ·
26403240 (1) ·
26405249 (1) ·
26502106 (1) ·
27270218 (1) ·
27363468 (1) ·
28004932 (1) ·
28121703 (1) ·
28121720 (1) ·
28204418 (1) ·
28212071 (1) ·
28240145 (1) ·
28244125 (1) ·
28244206 (1) ·
28461638 (1) ·
28461701 (1) ·
28563417 (1) ·
29032507 (1) ·
29042244 (1) ·
29104339 (1)
80022643 (1) ·
80022719 (1) ·
80032688 (1) ·
80074489 (1) ·
80074659 (1) ·
80074689 (1) ·
80144936 (1) ·
80193068 (1) ·
80284807 (1) ·
80394197 (1) ·
80394266 (1) ·
80401977 (1) ·
80451074 (1) ·
80461706 (1) ·
80470709 (1) ·
80493553 (1) ·
80533778 (1) ·
80533868 (1) ·
81040532 (1) ·
81040678 (1) ·
81060965 (1) ·
81261295 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)