Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'17th Avenue North ' (1) ·
'C-18 Canal ' (1) ·
'Canal L-14 ' (1) ·
'Donald Ross Road ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Indian River ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'Military Trail ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'Summit Boulevard ' (1) ·
'Tomoka River ' (1) ·
'Triple box culvert ' (1)
'Congress Ave. ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MARGINAL RD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Old Dixie Hwy. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-401 SB ' (1) ·
'SR-520 ' (1) ·
'SR91 N/S TPK 93.3 ' (1)
700030 (1) ·
700171 (1) ·
794016 (1) ·
930163 (1) ·
930171 (1) ·
930259 (1) ·
930291 (1) ·
930292 (1) ·
930294 (1) ·
930335 (1) ·
930336 (1) ·
930378 (1) ·
930382 (1) ·
930383 (1) ·
930386 (1) ·
930387 (1) ·
931001 (1) ·
934214 (1) ·
937356 (1) ·
940113 (1) ·
940114 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.25 mile North of SR 786' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.4 mile North of 45th St' (1) ·
'0.5 Mile East of U.S 1 ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 882 ' (1) ·
'Lake Worth ' (1) ·
'South of Ramp to SR 706 ' (1) ·
'SR-401 SB - Barge Canal ' (1)
80040620 (1) ·
80041030 (1) ·
80041480 (1) ·
80041600 (1) ·
80052230 (1) ·
80053750 (1) ·
80060655 (1) ·
80060720 (1) ·
80061820 (1) ·
80074066 (1) ·
80074402 (1) ·
80085515 (1) ·
80085650 (1) ·
80102528 (1) ·
80104062 (1) ·
80130501 (1) ·
80251481 (1) ·
80251602 (1) ·
80375608 (1) ·
80432467 (1) ·
81051074 (1)
115000 (1) ·
1401 (1) ·
1500 (1) ·
160500 (1) ·
16250 (1) ·
213000 (1) ·
226000 (1) ·
236000 (1) ·
25000 (1) ·
38750 (1) ·
52652 (1) ·
5900 (1) ·
600 (1) ·
71250 (1) ·
78500 (1) ·
85750 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
10236 (1) ·
123619 (1) ·
136198 (1) ·
148776 (1) ·
1696 (1) ·
1800 (1) ·
199525 (1) ·
278468 (1) ·
28194 (1) ·
369555 (1) ·
392110 (1) ·
409460 (1) ·
43375 (1) ·
67231 (1) ·
720 (1) ·
91351 (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)