Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Place 004:
West Palm Beach
& Service Under 042b
:
Highway - Waterway
or
Highway-railroad 




Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'CSX RAILROAD ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR-710 ' (1) ·
'Turnpike (SR-91) ' (1)
'45th Street CR-702' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'PLM BEACH LAKES BL' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I-95 to PBIA ' (1) ·
'U.S.-1 (SR-5) ' (1) ·
'US-98 (SR-80) ' (1)
930053 (1) ·
930470 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930488 (1) ·
930489 (1) ·
930494 (1) ·
934166 (1) ·
937709 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.